1. Customized development of wind farm

 (1) Description

According to main tasks of the owner in different wind farm delvelopment stage, company provides technical support. The company can provide detailed assessment results of proposed wind farm area wind resources in project planning stage, accurate project positioning analysis will be supplied to owners. During the early stages of project, realizing customized design of wind turbines with wind farm situation provides suitable scheme.

 (2) Picture

2. Full life cycle of wind farm information and asset management

 (1) Description

Information and asset management can collect, store and analyse data of full life cycle in wind farms. Based on large data, support of R&D, operation and maintenance, scheduling, management and control will be achieved. The core is the conversion of assets and data. Digital storage and management assets will be realized, while cost cutting and improve performance of wind farms can be reached by data analysis, fault warning, efficient operation and maintenance, material vehicle management.

 (2) Picture

3. Reliability growth plan of wind farm

 (1) Description

Product life cycle can be divided into conceptual design, feasibility analysis, design, trial manufacture, mass production, transportation, storage, sales, field deployment and retirement. Over time, uncertainty factors are increasing that affected the reliability of products.Based on the reliability management process, reliability efforts will be integrated into the whole life cycle of products at the program definition, design, development, manufacturing and field deployment phase.

 (2) Picture

4. Wind power intelligent platform

 (1) Description

Wind power intelligent platform includes wind turbine and wind farm intelligentization.The wind turbine intelligentization includes: 1.advanced sensing technology; 2.intelligent control strategy; 3.self-learning and adaptive control. The wind farm intelligentization includes: 1. information sharing of wind farms; 2.wind prediction and control system; 3.optimal utilization strategy of wind resources; 4.virtual synchronization technology.

 (2) Picture

5. The later stage assessment and optimization of the wind farm

 (1) Description

The company will provide services including: power characteristics, vibration characteristics and reliability assessment of wind turbines for constructed wind farms. According to the actual situation of the wind turbines the company will formulate optimization and control program, and localization, intelligentization and individuation of control strategy can be realized. Advanced observation equipments in wind farm control tail flow, sector and wind farm power generation

 (2) Picture

6. Decommissioning management of wind farm

In accordance with historical distribution of wind power installation, problems of decommissioning will become more prevalent after 2020. Life cycle management system can test and control actual lifetime of wind farms in all directions. As the technical reserves for extension service and retired recovery of decommissioning wind farms.