In 2017, CRRC Ziyang Co., Ltd. and Midland East Power Ltd. signed the EPC Contract of Ashuganj 150MW HFO Power Plant in Bangladesh. On November 26th, 2018, the project successfully completed the construction of the civil engineering, finished the installation and commissioning of gensets and its auxiliary system and the electrical system of the whole plant and realized the one-time COD delivery. The average load of the power plant reached 155.3 MW, exceeding the capacity requirements specified in the contract. |
Project Overview |
Owner:Midland East Power Ltd. | Project Site:Ashuganj, Bangladesh |
Equipment:B32:40V Genset(23 Sets) | Capacity:23×7015kW |
Fuel:HFO+LFO | Mode:EPC |
Commencement Time:Nov. 2017 | Completion Time:Nov. 2018 |
Features: 1.Largest single HFO power plant in Bangladesh. 2.Complex and highly integrated auxiliary modules. 3.Fast delivery. 4.Low Emission. |